WHO GMP Explained: What the Certificate Proves for US Buyers
A WHO GMP certificate is a site-level GMP certificate from a national or state regulator, not from WHO. It covers one site and does not replace FDA requirements for US buyers.
By Sunil Kumar, Managing Director - Sales · Updated 4 Oct 2026

Key takeaways
- A WHO GMP certificate is a site-level GMP certificate issued by a national or state regulator, often as part of a certificate of pharmaceutical product (CPP) application under the WHO Certification Scheme, or in WHO's model format, which is outside that Scheme. WHO itself does not issue it.
- Read the site address, the permitted category and the dates on the certificate. The logo and the phrase "WHO GMP certified" prove nothing on their own.
- For US supply, FDA's current good manufacturing practice (CGMP) requirements and your own audit against ICH Q7 (the International Council for Harmonisation's GMP guideline for active pharmaceutical ingredients, or APIs) decide qualification. Treat WHO GMP as supporting evidence.
CDSCO's list dated 31 December 2025 carries 3,582 units and still lists entries whose validity dates have passed, so confirm any certificate in writing with the issuing authority.
In this article
- 1What does WHO GMP mean, and who actually certifies it?
- 2Is a WHO GMP certificate the same as a CPP, a batch certificate or a certificate of analysis?
- 3Does a WHO GMP certificate satisfy FDA requirements for US supply?
- 4What does India's public list of WHO GMP-certified units show when you count it?
- 5How can you test a supplier's "WHO GMP certified" claim in seven steps?
- 6What can you send a supplier to run all seven checks at once?
- 7How do we handle documentation requests at Aarise Pharmaceuticals?
- 8Frequently asked questions
A supplier's page says "WHO GMP certified" and the conversation often ends there. It should start there. The phrase names a good manufacturing practice (GMP) standard from the World Health Organization (WHO), not a number you can look up, and the document behind it varies in what it covers, which site it names and how old it is.
India's drug regulator, the Central Drugs Standard Control Organisation (CDSCO), published a list of WHO-GMP certified manufacturing units dated 31 December 2025 whose state totals add up to 3,582 units. A listing is a lead, not proof: you still need the certificate itself.
A WHO GMP certificate can be genuine and still not cover the material you are buying. It may name a different site from the one that makes your batch, permit a different dosage form or ingredient class, or have passed its validity date. For US supply it also does not replace FDA's own requirements.
What does WHO GMP mean, and who actually certifies it?
WHO GMP is good manufacturing practice guidance written by WHO. A WHO GMP certificate is a site-level GMP certificate issued by a national or state regulator, often as part of a CPP application under the WHO Certification Scheme, or in WHO's model format, which is outside that Scheme. WHO itself does not issue it.
GMP exists because testing the finished product cannot remove every risk from a poorly controlled process. WHO's explanation of GMP describes it as designed to minimize the risks that final testing cannot eliminate. For finished pharmaceutical products, the main text is WHO Technical Report Series (TRS) 986, Annex 2 (2014). For APIs, WHO's GMP standard is TRS 957, Annex 2 (2010), "WHO good manufacturing practices for active pharmaceutical ingredients (bulk drug substances)"; TRS 986 Annex 2 covers finished products.
The guidance is not law by itself. More than 100 countries have written WHO's GMP provisions into national medicines laws, and more follow its approach in their own rules. WHO also runs a separate prequalification program for UN procurement, which is a different route from the certificate a supplier shows you.
The first route is the WHO Certification Scheme, a voluntary agreement in operation since 1969. A participating country's authority attests that a manufacturing site is inspected at suitable intervals against WHO-recommended GMP, usually as part of a CPP. The second is WHO's model GMP certificate, covered below, which a regulator can issue on its own. In India, CDSCO publishes lists of certified units compiled from returns by the states and union territories.
Is a WHO GMP certificate the same as a CPP, a batch certificate or a certificate of analysis?
No. A site GMP certificate covers a manufacturing site. A CPP covers one product. A batch certificate or certificate of analysis (COA) covers one batch. A supplier can hold one of these documents and be unable to provide any of the others.
| Document | Covers | Issued by | Question it answers |
|---|---|---|---|
| Site GMP certificate | One site and its permitted categories | The regulator that inspected the site | Was this site inspected against GMP? |
| CPP | One finished product | The certifying authority under the WHO Certification Scheme | Is this product authorized, and is its site inspected? |
| Batch certificate | One batch | Normally the manufacturer | Does this lot meet its specification? |
| COA | One batch's test results | The manufacturer | What did this lot measure? |
WHO's model GMP certificate is a suggested template for importers, procurement agencies and regulators that ask for a site-specific certificate. It is not part of the Scheme. It stays valid for two years from issue and never beyond three years after the inspection.
The CPP is written for finished products: its model asks for the unit formulation, including all excipients. If you buy an API, ask for the site certificate and the batch COA instead.
Does a WHO GMP certificate satisfy FDA requirements for US supply?
Not by itself. A WHO GMP certificate comes from the exporting country's regulator, while FDA applies its own current good manufacturing practice (CGMP) requirements and inspects facilities worldwide, including those making active ingredients. For US sourcing, treat the certificate as supporting evidence and qualify the site yourself.
The "C" in CGMP stands for "current", meaning companies must use up-to-date technologies and systems. For APIs, the working standard is ICH Q7, which FDA publishes as Q7 for APIs used in human drug products.
As of FDA's 3 August 2026 report, its India office completed 139 inspections in fiscal year 2025, 47% unannounced, and 76 in fiscal year 2026 to date, 87% unannounced.
Our recommendation: ask any supplier for the site's FDA establishment identifier (FEI), the unique number FDA uses to assign, monitor and track inspections of a firm, and the date of its last FDA inspection. Do this before relying on any "FDA compliant" wording.

What does India's public list of WHO GMP-certified units show when you count it?
CDSCO's list dated 31 December 2025, released 17 June 2026, shows 3,582 certified units across 26 states and union territories, and Gujarat alone accounts for 1,729. It is a cross-check, not proof: a listing does not show that any single certificate is current, so confirm with the issuing authority.
We counted on 4 October 2026, using the 31 December 2025 PDF linked from CDSCO's Industry Miscellaneous page. The sample is the full 373-page file. Our row-level parse recovered 3,482 entries, fewer than the 3,582 in the state totals, so row-level figures below are approximate.
- Total: the state table sums to 3,582 units across 26 states and union territories with entries. Ten more are listed as nil. The printed totals for Goa (48) and Maharashtra (536) include 189 loan-license manufacturers (10 and 179).
- Concentration: Gujarat holds 1,729 of the 3,582 (48.3%, from 1,729 ÷ 3,582). Maharashtra has 536, Himachal Pradesh 273, Telangana 233 and Uttarakhand 166 (4.6%).
- Uttarakhand: the state's total was 104 on the list as received from the States and UTs as on February 2015 (1,329 units in all), and 36 on CDSCO's January 2023 to March 2024 list. A state's absence or a drop reflects what it submitted to CDSCO, not a verdict on its plants (our inference). None of the 161 Uttarakhand rows we parsed names an API or bulk drug in its permitted category.
- Dates: the list now has a validity column. Of the 3,482 rows we parsed, 3,112 carry a readable date. Formats mix day-first and month-first, so we compared each row's latest date with 4 October 2026 under both readings: at least 268 rows show a date before that day under either reading, 2,259 show a later date under either reading, and 585 depend on the reading. The other 370 rows carry no readable date.
- Scope: matching "bulk drug" (case-insensitive, whitespace-tolerant) on text extracted from the PDF gave 747 matches as of 4 October 2026; this counts category mentions, not distinct sites. Some entries label the category "API" or "APIs" instead and are not in that count.
As of 15 July 2025, Indian manufacturers apply for a WHO-GMP certificate of pharmaceutical product (COPP) only through CDSCO's Online National Drugs Licensing System (ONDLS) portal.
Our reading: a name on this list is a useful lead, and a missing name means little. Neither replaces a dated certificate copy confirmed by the issuing authority.
How can you test a supplier's "WHO GMP certified" claim in seven steps?
Run seven checks in order: issuer, site, scope, dates, authority confirmation, document type and US standing. Each has a pass and a fail. A supplier that passes all seven has given you evidence worth taking into an audit. A failure on steps one to four should stop the order until it is explained.

- Step 1: Did a drug regulator issue it?Pass: a national or state drug regulator is named, with an issue date and signatory. Fail: the issuer is a private consultancy, or the document claims to come from WHO. A private certificate can be genuine, but it is a different document.
- Step 2: Does the address match the site that makes your material?Pass: the certificate's site address matches the manufacturer named on your quotation and COA. Fail: only a company name or head-office address appears. When material comes from a manufacturing partner, the certificate you need belongs to the site that makes the batch.
- Step 3: Does the scope cover what you are buying?Pass: the permitted category covers your dosage form or API class, and for an API site the inspection standard is WHO's TRS 957 Annex 2 (2010), not the finished-product text. Fail: a tablet certificate offered for an API purchase.
- Step 4: Is it in date?Pass: an issue date is printed and the term fits WHO's model of two years, no more than three after inspection. Accept a longer term only if the issuing authority confirms it. Fail: no date, or a date that has passed.
- Step 5: Does the issuing authority confirm it?Pass: the issuing authority confirms in writing the certificate number, site address, scope and validity date; a listing on the latest CDSCO list is a supporting lead only. Fail: the supplier cannot name an authority to contact. Absence from the CDSCO list alone is not a fail, because a state's absence reflects what it submitted, so write to the authority.
- Step 6: Is it the right kind of document?Pass: you hold a site certificate plus a batch COA for an API, or a CPP for a finished product. Fail: a CPP offered for an API, or a COA offered in place of a site certificate.
- Step 7: What is the site's FDA standing, and have you audited it?Pass: the FEI and last FDA inspection date are supplied, and an ICH Q7 audit or questionnaire is completed; fail if either is missing. If the site has never been inspected by FDA, ask for the latest regulator audit report or run your own ICH Q7 audit. A missing FEI is not a fail on its own, but "FDA registered" or "FDA approved" wording without one is.
What can you send a supplier to run all seven checks at once?
Replace [number] with the CAS number, the Chemical Abstracts Service registry number that identifies a substance.
Subject: Document request: [product], CAS [number], destination [country]
Please send:
1. The GMP certificate for the site that manufactures this material,
showing issuing authority, issue date and validity.
2. The site's full address as printed on the certificate.
3. The permitted category on the certificate.
4. The site's FDA establishment identifier (FEI) and the date of its
last FDA inspection, if any.
5. The COA for the current batch and the specification.
6. Confirmation of which site makes, tests and releases the batch.
How do we handle documentation requests at Aarise Pharmaceuticals?
Send us the product name or CAS number, quantity, destination, grade or purity, the documents you need, payment terms and Incoterms (international shipping terms). Before we quote, we confirm which documentation applies to that product, its manufacturing source and your destination.
We are an India-based API supplier, sourcing partner, distributor and exporter serving pharmaceutical companies, importers and other B2B buyers. The certificate you need is the one for the site that makes your batch, and we supply from approved manufacturing sources. Available documents may include a COA, specifications and a safety data sheet (SDS/MSDS) where applicable. We support sample and evaluation quantities for qualified B2B buyers, with quantity, price and documents confirmed product by product.
Aarise does not provide a drug master file (DMF), CPP or certificate of suitability (CEP) for steroid APIs. We support documentation and supply for US importers; send the request above and we will say which documents exist for your product. The seven checks apply to us as to any supplier.
Some materials are restricted, controlled or need special import authorization in certain jurisdictions. Before commercial supply, confirm local registration, import authorization and permitted end use, and tell us your destination first.
Request a quotation and documentation list, or reach our sales team at sunil@aarisepharma.com or on WhatsApp at +91 9899783330.
Frequently asked questions
WHO publishes both texts on its site: WHO good manufacturing practices for pharmaceutical products: main principles, TRS 986, Annex 2 (2014) for finished products, and WHO good manufacturing practices for active pharmaceutical ingredients (bulk drug substances), TRS 957, Annex 2 (2010) for APIs.
A new manufacturer applies to the drug regulator of its own country or state, which inspects the site and issues the certificate. WHO does not. WHO's Scheme guidelines (TRS 1033, Annex 9) place GMP inspection and licensing of manufacturers with the certifying authority, so plan on holding the manufacturing license first (our reading). In India, applications go through CDSCO's ONDLS portal as of 15 July 2025.
Sources
- 1.WHO TRS 986, Annex 2: WHO good manufacturing practices for pharmaceutical products, main principles (2014)
- 2.WHO TRS 957, Annex 2: WHO good manufacturing practices for active pharmaceutical ingredients (bulk drug substances) (2010)
- 3.WHO: Medicines, good manufacturing practices (questions and answers)
- 4.WHO: Good manufacturing practice (GMP) standards
- 5.WHO TRS 1033, Annex 9: Guidelines on the implementation of the WHO Certification Scheme (2021)
- 6.WHO: Model certificate of good manufacturing practices
- 7.FDA: Facts about the current good manufacturing practice (CGMP)
- 8.FDA Voices: Investing in FDA's inspectional enterprise (3 August 2026)
- 9.FDA: Q7 Good Manufacturing Practice Guidance for Active Pharmaceutical Ingredients
- 10.FDA: Identification of manufacturing establishments in applications (FEI)
- 11.CDSCO: WHO GMP certified manufacturing units for COPP, up to 31 December 2025 (released 17 June 2026)
- 12.CDSCO: Industry Miscellaneous page
- 13.CDSCO: WHO-GMP certified manufacturing units for COPP, January 2023 to March 2024
- 14.CDSCO: WHO GMP certified manufacturing units for COPP, list as received from the States and UTs as on February 2015
- 15.TeamLease RegTech: CDSCO mandates online WHO-GMP COPP applications via ONDLS portal from 15 July 2025



