All articles
11 min read

Regulatory Starting Material: What an API Buyer Must Ask

A regulatory starting material is the compound where an active ingredient's regulated manufacture begins; the applicant picks and justifies it in the filing, so buyers should ask each supplier to name it.

By Sunil Kumar, Managing Director - Sales · Updated 3 Nov 2026

A pharmaceutical buyer at a desk reviews a printed supplier dossier next to a vial of white powder.

Key takeaways

  • An RSM is named by the applicant in the regulatory filing, and the International Council for Harmonisation (ICH) Q7 standard for API GMP applies from its first use onward. Your supplier’s paperwork won’t show it unless you ask, so request the compound by name.
  • Regulators weigh all the ICH Q11 principles (the guideline on developing drug substances) together. A compound that resembles the API, or that several suppliers sell, does not qualify on that basis alone, and Q11 sets no minimum number of steps.
  • In FDA’s fiscal year 2023 data, inadequate starting material selection made up 7.5% of major deficiencies in drug master files (DMFs), far behind unqualified impurities at 67.5%.
  • Send the ten pass/fail questions below with every API RFQ, and get any change notification in writing.
In this article
  1. 1What is a regulatory starting material, and where does GMP begin?
  2. 2Why does the same API have a different regulatory starting material at each manufacturer?
  3. 3How do regulators decide whether a compound qualifies as a regulatory starting material?
  4. 4What happens to supply when regulators push back on a regulatory starting material?
  5. 5What share of FDA's major DMF deficiencies concern starting material selection?
  6. 6What should an API buyer ask a supplier about the regulatory starting material?
  7. 7Which compound is the RSM, and how far is it from the API?
  8. 8Is the RSM specified tightly enough?
  9. 9Who makes the RSM, and is that source fixed?
  10. 10What happens when the RSM changes?
  11. 11How does Aarise Pharmaceuticals handle regulatory starting material questions on an API quote?
  12. 12Conclusion
  13. 13Frequently asked questions

A certificate of analysis tells you what is in the drum. It does not tell you where good manufacturing practice (GMP) began on the way there. That boundary is a regulatory decision, not a property of the powder, and the filing records it as the regulatory starting material (RSM).

Each manufacturer’s process sets its own RSM, and the filing for the drug that uses the active pharmaceutical ingredient (API) carries it. Two suppliers of the same API can therefore start from different compounds, and a change upstream has to travel down the supply chain before anyone can assess it.

This guide is for formulators, importers and distributors who buy API, not for the sponsor choosing the RSM. It explains what the term means, how regulators test a proposed compound, what happens when they push back, and how large a share of FDA’s drug master file major deficiencies concern starting material selection. It ends with a ten-question sheet to send with your request for quotation (RFQ).

What is a regulatory starting material, and where does GMP begin?

A regulatory starting material is the compound the applicant names in the filing as the point where drug substance manufacture under GMP begins. ICH Q11 states that the GMP provisions of ICH Q7 apply to each branch of the process "beginning with the first use of a starting material". Q11's "starting material" and Q7's "API starting material" are the same material.

Steps before the RSM fall outside ICH Q7, but that does not make them uncontrolled. The ICH Q7 Q&A (question 1.1) expects "an appropriate level of controls suitable for the production of the API starting material". When a supplier says its early steps are "not GMP", it is telling you where the boundary sits. Your next question is which compound sits on it. Our guide to ICH Q7 covers the GMP standard itself.

FDA guidance states that "should" means recommended, not required, unless a regulation is cited. The principles below are the standard applicants are expected to meet or explain.

Why does the same API have a different regulatory starting material at each manufacturer?

The boundary is set for each process, not each molecule. The API starting material "is defined in the regulatory filing by the applicant and approved in the regulatory reviewing process". A starting material accepted for one manufacturer's process "may not be considered acceptable for a different manufacturer's process".

That has four consequences for a buyer:

  • You must ask for the RSM directly. It is a filing decision, so it will not appear unless you request it.
  • A change of source is a change to assess. The ICH Q7 Q&A (question 12.3) says any change in the API starting material should be assessed for its effect on the process and the API. For a different source, "validation would be expected" in most cases "unless otherwise justified".
  • Change information has to travel. The Q11 Q&A (question 5.16) makes each party in the supply chain responsible for passing quality or regulatory changes to the next customer.
  • The buyer stays accountable. The Q11 Q&A (question 5.15) quotes ICH Q10: "The pharmaceutical company is ultimately responsible to ensure processes are in place to assure the control of outsourced activities and quality of purchased materials."

The industry committee APIC rates registered starting materials as high-criticality in its 2024 supplier-management guide and supplies a quality agreement template for them. Our recommendation: treat the RSM's identity and change notification as contract terms, not courtesies.

Two manufacturing lines in a clean plant, each starting its process at a different vessel.

How do regulators decide whether a compound qualifies as a regulatory starting material?

They apply every ICH Q11 principle together, and no single principle decides the outcome. The Q11 Q&A (question 5.1) asks for a rationale when a proposal does not meet them all. The principles in Q11 section 5.1.1 are:

  • Changes early in the process are less likely to affect quality, because impurities made early have more chances to be purged.
  • Enough of the process is described for regulators to see how impurities form and are removed, typically "multiple chemical transformation steps".
  • Steps that affect the impurity profile belong in the described process.
  • Each branch of a convergent process begins with its own starting material.
  • The RSM has defined chemical properties and structure; non-isolated intermediates are usually not appropriate.
  • It is a "significant structural fragment", which separates starting materials from reagents, solvents and other raw materials. Common chemicals used to make salts, esters or simple derivatives count as reagents.

The Q&A closes four common misreadings:

  • Looking like the API is not enough. A starting material justified solely as a significant structural fragment "probably will not be accepted" (question 5.5).
  • Several suppliers is not enough. "Commercially available" means sold as a commodity in a non-pharmaceutical market, and custom-synthesized chemicals need justification (question 5.6; Q11 section 5.2.1).
  • There is no required step count. Q11 does not say how many steps must run under GMP. Few steps raise contamination risk, which is often best handled by adding steps (question 5.11). Three steps in Q11's own example are not "enough in all cases, nor… mandatory" (question 5.8). Any "three-step rule" is a rule of thumb.
  • Purification cannot be used to move the boundary. Adding purification steps ahead of a proposed RSM to avoid naming an earlier compound "would not be considered appropriate" (question 5.11).

Peptides are a special case. For peptides built on a solid support, Q11 notes that the link between risk and number of steps is more limited. A protected natural amino acid can be accepted as a starting material with a rationale (question 5.6).

What happens to supply when regulators push back on a regulatory starting material?

A push back means regulators ask the applicant to move the GMP boundary upstream by adding earlier steps. A 2018 Pharmaceutical Technology review by authors from STA Pharmaceutical and Akebia lists the usual triggers: too few steps, weak controls on GMP intermediates, thin starting material specifications, missing synthesis detail and an incomplete appraisal of the route. The Q11 Q&A (question 5.11) gives the logic. With only a few steps under GMP, contamination risk and the effect of a later route or supplier change are harder to control, so adding steps is often the remedy.

For a buyer, a push back can mean a new RSM source, a supplier requalification or a gap in lots. Ask whether the supplier has identified an earlier compound it could name if regulators push back, and whether the current RSM is already made at a site that runs under GMP. The review notes that this allows retroactive validation and keeps existing inventory.

What share of FDA's major DMF deficiencies concern starting material selection?

In FDA's fiscal year 2023 (FY2023) analysis of drug master files with major deficiencies, inadequate starting material selection was 7.5% of the deficiencies, well behind unqualified impurities at 67.5%. FDA does not state how many applications this stopped.

A drug master file (DMF) is the confidential file in which an API maker gives FDA its process details, and a generic applicant references it. An abbreviated new drug application (ANDA) is the generic drug filing. The analysis covered first-cycle major deficiencies (284 complete response letters, 429 major deficiencies):

Major deficiency in DMFs (FDA, FY2023)Share
Unqualified impurity67.5%
Insufficient drug substance characterization15.0%
Inadequate starting material selection7.5%
Analytical method development required5.0%
Major drug substance process change2.5%
New drug substance batch required2.5%

The shares add to 100%. DMF problems made up 82% of drug-substance-related major deficiencies, unqualified impurity 8%, and a miscellaneous group (which includes inadequate selection or justification of starting materials) 10%.

Treat the 7.5% as an indication. It covers one fiscal year, and the shares move in 2.5-point steps, so the pie covers at least 40 DMFs and the starting material slice is at least three of them (our inference from the percentages; the slide gives no count).

The EU shows the same pattern. According to the EDQM Top Ten Deficiencies in New CEP Applications (February 2024), a random sample of 30 deficiency letters for new certificate of suitability (CEP) applications assessed in 2023 showed that poor description of the process from the introduction of starting materials made up 12% of all questions, and inadequate or poorly justified starting material specifications a further 7%. The sample is small, so read it as direction, not a rate.

Impurities and the RSM are the same conversation. The Q&A (question 5.7) judges whether a step affects the impurity profile against the ICH Q3A impurity identification threshold, or 30% of the limit under ICH M7, the guideline on mutagenic impurities. FDA's own recommendation is to "strengthen communications between the ANDA applicants and DMF holders". For a buyer, that points to the questions below.

What should an API buyer ask a supplier about the regulatory starting material?

Ask the ten questions below and score each against the pass test. The sheet is our recommendation, built from the ICH Q11, its Q&A and the ICH Q7 Q&A. It is not an FDA form.

Which compound is the RSM, and how far is it from the API?

A buyer and a supplier quality manager review a paper checklist across a meeting table.
#Ask the supplierPassFail
1Name the RSM and its CAS number (Chemical Abstracts Service Registry Number, a unique ID for a substance).A named compound with a CAS number."Proprietary", "an intermediate", or no name.
2Is the RSM sold as a commodity outside pharmaceutical use, or made to order for drug manufacture?Documented non-pharmaceutical market use, or for a custom-made compound a written justification against the Q11 principles."Several suppliers sell it" as the only evidence.
3How many chemical transformation steps separate the RSM from the API, and why is that enough?A number plus a reason tied to impurity removal.A number alone, or "three steps" as the reason.

Is the RSM specified tightly enough?

#Ask the supplierPassFail
4Send the RSM specification.

Identity and purity tests with limits and validated methods, plus residual solvents, elemental and mutagenic impurities where they apply (see our guide to nitrosamine impurities).

Assay and appearance only.
5Which RSM impurities carry into the API, and which are removed?Named impurities, each with the step that removes it or the limit that controls it."All removed", with no data.

Who makes the RSM, and is that source fixed?

#Ask the supplierPassFail
6Who manufactures the RSM, at which site, and when did you last audit that site?Manufacturer and site named, with the date and type of your last audit of it."Sourced on the market," or no audit record.
7Is there more than one RSM source for this API?Every source named, each switch treated as a change to assess.Sources change without notice.

What happens when the RSM changes?

#Ask the supplierPassFail
8Will you tell us in writing before any change to the RSM source, route or specification?

A written commitment, ideally inside a pharmaceutical quality agreement, with notice before affected lots ship.

A verbal assurance.
9How is a change of RSM source assessed?A documented assessment of impact on the process and the API, with validation expected in most cases."Same chemistry, no assessment."
10Which documents travel with each lot?A lot-specific certificate of analysis showing tests and limits, the specification, and the safety data sheet (SDS).A generic template.

How to use the results. Our recommendation: pause evaluation until questions 1 to 3 pass. Move questions 8 and 9 into your quality agreement. Run your first lot through the checks in our API sample request guide.

How does Aarise Pharmaceuticals handle regulatory starting material questions on an API quote?

Send the ten questions with your RFQ and ask for the starting material in writing at the quotation stage. Aarise Pharmaceuticals confirms documentation product by product and depends on the approved manufacturing source for each API, so request the answers to questions 1 to 3 for your specific API in the quotation. Also ask which regulatory documents exist for that API, such as a DMF number with a Letter of Authorization or CEP status (what these certifications actually show), and we confirm what is available for each product.

Start your request with the API name or CAS number, quantity, destination, grade or purity, documents and Incoterms (the standard trade terms that divide shipping cost and risk). We supply steroid, peptide, hormone and general pharmaceutical APIs; see our US pharma raw material catalog. Sample quantities are available for qualified B2B buyers, and before commercial supply buyers confirm local registration, import authorization and permitted end use.

Send your RFQ and the sheet through the contact form. Email: sunil@aarisepharma.com. WhatsApp: +91 9899783330.

Conclusion

The starting material sits in the filing, not on the certificate of analysis, so you have to ask for it, and the right question depends on your stage. If your product is already marketed or under ANDA review, ask each supplier how an RSM change would reach you and how many days ahead. If it is still in development, ask whether the RSM was justified for a marketing application and not only for clinical supply, because regulators tend to press harder on designations at that stage. This week, attach the ten-question sheet to every open RFQ and ask for written answers to questions 1 to 3 first. To start, send your RFQ and the sheet to Aarise Pharmaceuticals with the API name or CAS number, and ask for the starting material in writing.

Talk to our team

Leave your details and we'll get back to you.

Frequently asked questions

A starting material is incorporated into the drug substance as a significant structural fragment. Reagents, solvents and other raw materials are not. ICH Q11 treats commonly available chemicals used to make salts, esters or simple derivatives as reagents, not starting materials.
Only if the justification meets all the Q11 principles. A late intermediate chosen because it resembles the API probably will not be accepted. Non-isolated intermediates are generally not appropriate. A chemical that is truly commercially available can enter late in the synthesis.
No. ICH Q11 sets no minimum number of steps; it asks for enough described steps to show how impurities form and are removed.
The applicant, a term the Q11 Q&A reads broadly: the marketing authorization holder, the filing applicant, the drug product manufacturer or the drug substance manufacturer.
FDA guidance describes current thinking and is a recommendation unless a regulation is cited. The Q11 Q&A says Q11 does not apply to submission contents during clinical research stages, though its development principles remain important to consider then.

Sources

  1. 1.ICH Q11: Development and Manufacture of Drug Substances, Step 4, 1 May 2012
  2. 2.Q11 Development and Manufacture of Drug Substances: Questions and Answers (guidance, February 2018)
  3. 3.Q7 Good Manufacturing Practice Guidance for Active Pharmaceutical Ingredients: Questions and Answers (guidance, April 2018)
  4. 4.Common Quality Major Deficiencies in ANDAs, Generic Drugs Forum, 10 April 2025
  5. 5.Best practices guide for managing suppliers of API manufacturers, version 2, 18 March 2024
  6. 6.Top ten deficiencies in new applications for Certificates of Suitability for chemical purity, European Directorate for the Quality of Medicines & HealthCare (EDQM), February 2024

Keep reading

Aarise Pharma.

© 2026 Aarise Pharma

Powered by PageLens.ai

Get in touch — we'd love to help.

Contact us